All parts

Bearing bracket HN

part:310020castings· EN-GJL-250· 14 kg· pump series HN· ABC A· prices per pc· demand and sourcing →

Negotiated in:P11replay · 71
Price today
€45.15
Odlewnia Kalwisz Sp. z o.o.
Full cost
—
what our agent assumes
Margin
—
(price − full cost) ÷ price
Drivers, 12 months
+2.3 %
63 % of cost index-linked
Asked
—
no open price letter
Bought FY2026
€612,345
13,500 pc

What the data says

  • 63 % of its cost follows market indices; over the last 12 months they moved its cost by +2.3 %.
  • Index falls our agent can cite: electric power generation, transmission and distribution −6.1 % (2025-11 → 2026-08).

Price against cost

Full cost is cost without margin. Our agent uses the should-cost of the supplier's own plant when there is one, else the German estimate scaled by the supplier's country (company rule of thumb).

MaterialConversionOverheadMargin (price above full cost)Current price
Odlewnia Kalwisz Sp. z o.o.sup:70140PL · active · quota 100 % · tooling: supplier
Price €45.15 since 2026-01-01 (Annual renewal)
Full cost no estimate
Should-cost argument —
Gießerei Pfaffenreuth GmbHsup:70190DE · qualified · quota 0 % · tooling: Hollerau
Price not buying
Full cost no estimate
Should-cost argument —

Price history

Every price condition since 2023 and the negotiation that set it: what the supplier asked and what was settled.

Odlewnia Kalwisz Sp. z o.o.
€45.20€46.47€47.73€49.002023202420252026€45.15
ValidSupplierWhyPriceChangeAsked → settledNote
2026-01-01 → openOdlewnia Kalwisz Sp. z o.o.Annual renewal€45.15−2.5 %−1.0 % → −2.5 %
2025-01-01 → 2025-12-31Odlewnia Kalwisz Sp. z o.o.Annual renewal€46.330.0 %+1.3 % → 0.0 %
2024-01-01 → 2024-12-31Odlewnia Kalwisz Sp. z o.o.Annual renewal€46.33−5.5 %−3.3 % → −5.5 %
2023-01-01 → 2023-12-31Odlewnia Kalwisz Sp. z o.o.New contract€49.05——

Cost drivers

Which market indices drive this part's cost and by how much (category team estimate). Contribution = weight × the index's 12-month change. The shaded window is the fall our agent would cite (≥ 0.5 % within 12 months to the latest month), else the last 12 months.

IndexShare of costLast 36 months12-month changeContributionOur agent can cite
Labour cost index DE, manufacturing, seasonally and calendar adjusted (quarterly, carried to its three months)
LCI-C · latest 2026-06: 119.6 (index 2020=100)
31 %
+2.7 %+0.82 ptno fall
Producer prices DE: basic iron and steel, ferro-alloys
PPI-C241 · latest 2026-08: 105.9 (index 2021=100)
26 %
+6.5 %+1.70 ptno fall
Producer prices DE: electric power generation, transmission and distribution
PPI-D351 · latest 2026-08: 131.9 (index 2021=100)
6 %
−3.7 %-0.22 pt
Index-linked share63 % (the rest does not follow an index)Weighted+2.30 %

What we bought

Purchase order lines by order date, fiscal year October to September.

YearQuantitySpendAvg paidPO lines
FY202412,520 pc€587,831€46.9524
FY202513,000 pc€602,290€46.33241 stale
FY202613,500 pc€612,345€45.3624

Avg paid is per pc. Standard price in the material master: €46.33; planned lead time 56 days.

Letters about this part

Supplier letters, e-mails and our memos that name this part. Each opens in its supplier's timeline.

  • 2026-09-21letterdoc:20260921-70140-P11
    Escalation: delivery and quality performance
    Hollerau Pumpenwerke, Supplier Quality