Adapter flange HX
part:320095machined parts· S355J2· 4.4 kg· pump series HX· prices per pc· demand and sourcing →new (start of production 2027-03)
What the data says
- 71 % of its cost follows market indices; over the last 12 months they moved its cost by +4.9 %.
- Index falls our agent can cite: cold drawing of bars −2.3 % (2026-06 → 2026-08); electric power generation, transmission and distribution −6.1 % (2025-11 → 2026-08).
Price against cost
Full cost is cost without margin. Our agent uses the should-cost of the supplier's own plant when there is one, else the German estimate scaled by the supplier's country (company rule of thumb).
No supplier on the source list yet.
| Estimate | Plant | Full cost | Material | Conversion | Overhead | Error | Method |
|---|---|---|---|---|---|---|---|
cost:3200952026-07-15 | generic, DE cost base | €25.21 | €8.32 | €11.82 | €5.07 | ±10 % | bottom-up estimate, German cost base, no margin included |
Price history
Every price condition since 2023 and the negotiation that set it: what the supplier asked and what was settled.
No price conditions for this part.
Cost drivers
Which market indices drive this part's cost and by how much (category team estimate). Contribution = weight × the index's 12-month change. The shaded window is the fall our agent would cite (≥ 0.5 % within 12 months to the latest month), else the last 12 months.
| Index | Share of cost | Last 36 months | 12-month change | Contribution | Our agent can cite |
|---|---|---|---|---|---|
Labour cost index DE, manufacturing, seasonally and calendar adjusted (quarterly, carried to its three months) LCI-C · latest 2026-06: 119.6 (index 2020=100) | 35 % | +2.7 % | +0.93 pt | no fall | |
Producer prices DE: cold drawing of bars PPI-C2431 · latest 2026-08: 129.1 (index 2021=100) | 33 % | +12.3 % | +4.05 pt | ||
Producer prices DE: electric power generation, transmission and distribution PPI-D351 · latest 2026-08: 131.9 (index 2021=100) | 3 % | −3.7 % | -0.11 pt | ||
| Index-linked share | 71 % (the rest does not follow an index) | Weighted | +4.87 % |
What we bought
Purchase order lines by order date, fiscal year October to September.
| Year | Quantity | Spend | Avg paid | PO lines |
|---|---|---|---|---|
| FY2024 | — | — | — | — |
| FY2025 | — | — | — | — |
| FY2026 | — | — | — | — |
Avg paid is per pc. Standard price in the material master: —; planned lead time 35 days.
Letters about this part
Supplier letters, e-mails and our memos that name this part. Each opens in its supplier's timeline.
No letters name this part.