All parts

Spacer sleeve

part:320090machined parts· 1.4301· 0.3 kg· pump series ALL· ABC C· prices per pc· demand and sourcing →

Price today
€4.60
Drehzentrum Ilzauer GmbH
Full cost
—
what our agent assumes
Margin
—
(price − full cost) ÷ price
Drivers, 12 months
+4.0 %
74 % of cost index-linked
Asked
—
no open price letter
Bought FY2026
€115,800
25,000 pc

What the data says

  • 74 % of its cost follows market indices; over the last 12 months they moved its cost by +4.0 %.
  • Index falls our agent can cite: cold drawing of bars −2.3 % (2026-06 → 2026-08); Alloy surcharge 1.4404, Isartal Edelstahlwerk (fictional mill, derived) −5.5 % (2026-06 → 2026-09); electric power generation, transmission and distribution −6.1 % (2025-11 → 2026-08).

Price against cost

Full cost is cost without margin. Our agent uses the should-cost of the supplier's own plant when there is one, else the German estimate scaled by the supplier's country (company rule of thumb).

MaterialConversionOverheadMargin (price above full cost)Current price
Drehzentrum Ilzauer GmbHsup:70295DE · active · quota 50 % · tooling: Hollerau
Price €4.60 since 2026-01-01 (Annual renewal)
Full cost no estimate
Should-cost argument —
Drehteile Fuchsreiter GmbHsup:70250DE · active · quota 50 % · tooling: Hollerau
Price €4.64 since 2026-01-01 (Annual renewal)
Full cost no estimate
Should-cost argument —

Price history

Every price condition since 2023 and the negotiation that set it: what the supplier asked and what was settled.

Drehzentrum Ilzauer GmbHDrehteile Fuchsreiter GmbH
€4.60€4.73€4.87€5.002023202420252026€4.64€4.60
ValidSupplierWhyPriceChangeAsked → settledNote
2026-01-01 → openDrehteile Fuchsreiter GmbHAnnual renewal€4.64−2.1 %−0.8 % → −2.1 %
2026-01-01 → openDrehzentrum Ilzauer GmbHAnnual renewal€4.600.0 %+3.3 % → 0.0 %
2025-01-01 → 2025-12-31Drehteile Fuchsreiter GmbHAnnual renewal€4.740.0 %+1.3 % → 0.0 %
2025-01-01 → 2025-12-31Drehzentrum Ilzauer GmbHAnnual renewal€4.60−1.7 %+1.7 % → −1.7 %
2024-01-01 → 2024-12-31Drehteile Fuchsreiter GmbHAnnual renewal€4.74−5.2 %−3.9 % → −5.2 %
2024-01-01 → 2024-12-31Drehzentrum Ilzauer GmbHAnnual renewal€4.68−3.1 %−0.1 % → −3.1 %
2023-01-01 → 2023-12-31Drehteile Fuchsreiter GmbHNew contract€5.00——
2023-01-01 → 2023-12-31Drehzentrum Ilzauer GmbHNew contract€4.83——

Cost drivers

Which market indices drive this part's cost and by how much (category team estimate). Contribution = weight × the index's 12-month change. The shaded window is the fall our agent would cite (≥ 0.5 % within 12 months to the latest month), else the last 12 months.

IndexShare of costLast 36 months12-month changeContributionOur agent can cite
Labour cost index DE, manufacturing, seasonally and calendar adjusted (quarterly, carried to its three months)
LCI-C · latest 2026-06: 119.6 (index 2020=100)
35 %
+2.7 %+0.93 ptno fall
Producer prices DE: cold drawing of bars
PPI-C2431 · latest 2026-08: 129.1 (index 2021=100)
19 %
+12.3 %+2.33 pt
Alloy surcharge 1.4404, Isartal Edelstahlwerk (fictional mill, derived)
AS-14404 · latest 2026-09: 3007.8019 (EUR/t)
15 %
+5.9 %+0.89 pt
Producer prices DE: electric power generation, transmission and distribution
PPI-D351 · latest 2026-08: 131.9 (index 2021=100)
5 %
−3.7 %-0.19 pt
Index-linked share74 % (the rest does not follow an index)Weighted+3.96 %

What we bought

Purchase order lines by order date, fiscal year October to September.

YearQuantitySpendAvg paidPO lines
FY202424,920 pc€118,484€4.7548
FY202525,200 pc€117,910€4.6848
FY202625,000 pc€115,800€4.6348

Avg paid is per pc. Standard price in the material master: €4.67; planned lead time 21 days.

Letters about this part

Supplier letters, e-mails and our memos that name this part. Each opens in its supplier's timeline.

No letters name this part.