Flange DN 65 PN 16, machined
part:320030machined parts· S235JR· 3.2 kg· pump series HN· ABC C· prices per pc· demand and sourcing →
What the data says
- 67 % of its cost follows market indices; over the last 12 months they moved its cost by +4.7 %.
- Index falls our agent can cite: cold drawing of bars −2.3 % (2026-06 → 2026-08); electric power generation, transmission and distribution −6.1 % (2025-11 → 2026-08).
- Today's price €16.02 carries a 3.9 % margin over its full cost €15.40
cost:320030: our agent can argue should-cost.
Price against cost
Full cost is cost without margin. Our agent uses the should-cost of the supplier's own plant when there is one, else the German estimate scaled by the supplier's country (company rule of thumb).
| Estimate | Plant | Full cost | Material | Conversion | Overhead | Error | Method |
|---|---|---|---|---|---|---|---|
cost:3200302026-07-15 | CNC-Technik Obermaier & Huber GmbH | €15.40 | €5.08 | €7.22 | €3.09 | ±5 % | bottom-up estimate of this supplier's plant, no margin included |
Price history
Every price condition since 2023 and the negotiation that set it: what the supplier asked and what was settled.
| Valid | Supplier | Why | Price | Change | Asked → settled | Note |
|---|---|---|---|---|---|---|
| 2026-01-01 → open | CNC-Technik Obermaier & Huber GmbH | Annual renewal | €16.02 | 0.0 % | +3.5 % → 0.0 % | |
| 2025-01-01 → 2025-12-31 | CNC-Technik Obermaier & Huber GmbH | Annual renewal | €16.02 | 0.0 % | +3.1 % → 0.0 % | |
| 2024-01-01 → 2024-12-31 | CNC-Technik Obermaier & Huber GmbH | Annual renewal | €16.02 | −4.1 % | −0.4 % → −4.1 % | |
| 2023-01-01 → 2023-12-31 | CNC-Technik Obermaier & Huber GmbH | New contract | €16.71 | — | — |
Cost drivers
Which market indices drive this part's cost and by how much (category team estimate). Contribution = weight × the index's 12-month change. The shaded window is the fall our agent would cite (≥ 0.5 % within 12 months to the latest month), else the last 12 months.
| Index | Share of cost | Last 36 months | 12-month change | Contribution | Our agent can cite |
|---|---|---|---|---|---|
Labour cost index DE, manufacturing, seasonally and calendar adjusted (quarterly, carried to its three months) LCI-C · latest 2026-06: 119.6 (index 2020=100) | 33 % | +2.7 % | +0.88 pt | no fall | |
Producer prices DE: cold drawing of bars PPI-C2431 · latest 2026-08: 129.1 (index 2021=100) | 32 % | +12.3 % | +3.92 pt | ||
Producer prices DE: electric power generation, transmission and distribution PPI-D351 · latest 2026-08: 131.9 (index 2021=100) | 2 % | −3.7 % | -0.07 pt | ||
| Index-linked share | 67 % (the rest does not follow an index) | Weighted | +4.73 % |
What we bought
Purchase order lines by order date, fiscal year October to September.
| Year | Quantity | Spend | Avg paid | PO lines |
|---|---|---|---|---|
| FY2024 | 9,840 pc | €159,300 | €16.19 | 241 stale |
| FY2025 | 9,820 pc | €157,316 | €16.02 | 24 |
| FY2026 | 9,100 pc | €145,782 | €16.02 | 23 |
Avg paid is per pc. Standard price in the material master: €16.02; planned lead time 35 days.
Letters about this part
Supplier letters, e-mails and our memos that name this part. Each opens in its supplier's timeline.
- Capacity situation and delivery datesCNC-Technik Obermaier & Huber GmbH