part:320010machined parts· 1.4404· 2.1 kg· pump series HN· ABC B· prices per pc· demand and sourcing →

Price today
€24.92
Feinmechanik Rottaler GmbH
Full cost
€25.22
what our agent assumes
Margin
−1.2 %
(price − full cost) ÷ price
Drivers, 12 months
+3.9 %
65 % of cost index-linked
Asked
—
no open price letter
Bought FY2026
€313,664
12,570 pc

What the data says

  • 65 % of its cost follows market indices; over the last 12 months they moved its cost by +3.9 %.
  • Index falls our agent can cite: cold drawing of bars −2.3 % (2026-06 → 2026-08); Alloy surcharge 1.4404, Isartal Edelstahlwerk (fictional mill, derived) −5.5 % (2026-06 → 2026-09); electric power generation, transmission and distribution −6.1 % (2025-11 → 2026-08).
  • Today's price €24.92 is below its full cost (margin -1.2 %) €25.22 cost:320010: the supplier loses money on this part. Squeezing it further adds risk, and for strategic and bottleneck parts the score charges for a supplier left below a sustainable margin.

Price against cost

Full cost is cost without margin. Our agent uses the should-cost of the supplier's own plant when there is one, else the German estimate scaled by the supplier's country (company rule of thumb).

MaterialConversionOverheadMargin (price above full cost)Current price
Feinmechanik Rottaler GmbHsup:70290DE · active · quota 70 % · tooling: Hollerau
Price €24.92 since 2026-01-01 (Annual renewal)
Full cost €25.22 (should-cost of its own plant)
Should-cost argument no
€8.83 + €11.47 + €4.92 = €25.22price €24.92 · €0.30 below full cost
Zerspanung Dralveck GmbHsup:70210DE · active · quota 30 % · tooling: Hollerau
Price €24.37 since 2026-01-01 (Annual renewal)
Full cost no estimate
Should-cost argument —
EstimatePlantFull costMaterialConversionOverheadErrorMethod
cost:320010
2026-07-15
Feinmechanik Rottaler GmbH€25.22€8.83€11.47€4.92±5 %bottom-up estimate of this supplier's plant, no margin included

Price history

Every price condition since 2023 and the negotiation that set it: what the supplier asked and what was settled.

Feinmechanik Rottaler GmbHZerspanung Dralveck GmbHFull cost (Feinmechanik Rottaler)
€24.40€25.05€25.70€26.352023202420252026full cost €25.22€24.92€24.37
ValidSupplierWhyPriceChangeAsked → settledNote
2026-01-01 → openZerspanung Dralveck GmbHAnnual renewal€24.37−3.0 %−0.9 % → −3.0 %
2026-01-01 → openFeinmechanik Rottaler GmbHAnnual renewal€24.92−2.9 %−1.2 % → −2.9 %
2025-01-01 → 2025-12-31Zerspanung Dralveck GmbHAnnual renewal€25.13+2.2 %+4.6 % → +2.2 %
2025-01-01 → 2025-12-31Feinmechanik Rottaler GmbHAnnual renewal€25.670.0 %+3.7 % → 0.0 %
2024-01-01 → 2024-12-31Zerspanung Dralveck GmbHAnnual renewal€24.58−6.6 %−3.2 % → −6.6 %
2024-01-01 → 2024-12-31Feinmechanik Rottaler GmbHAnnual renewal€25.67−2.7 %−0.1 % → −2.7 %
2023-01-01 → 2023-12-31Zerspanung Dralveck GmbHNew contract€26.31——
2023-01-01 → 2023-12-31Feinmechanik Rottaler GmbHNew contract€26.37——

Cost drivers

Which market indices drive this part's cost and by how much (category team estimate). Contribution = weight × the index's 12-month change. The shaded window is the fall our agent would cite (≥ 0.5 % within 12 months to the latest month), else the last 12 months.

IndexShare of costLast 36 months12-month changeContributionOur agent can cite
Labour cost index DE, manufacturing, seasonally and calendar adjusted (quarterly, carried to its three months)
LCI-C · latest 2026-06: 119.6 (index 2020=100)
33 %
+2.7 %+0.88 ptno fall
Producer prices DE: cold drawing of bars
PPI-C2431 · latest 2026-08: 129.1 (index 2021=100)
19 %
+12.3 %+2.33 pt
Alloy surcharge 1.4404, Isartal Edelstahlwerk (fictional mill, derived)
AS-14404 · latest 2026-09: 3007.8019 (EUR/t)
12 %
+5.9 %+0.71 pt
Producer prices DE: electric power generation, transmission and distribution
PPI-D351 · latest 2026-08: 131.9 (index 2021=100)
1 %
−3.7 %-0.04 pt
Index-linked share65 % (the rest does not follow an index)Weighted+3.88 %

What we bought

Purchase order lines by order date, fiscal year October to September.

YearQuantitySpendAvg paidPO lines
FY202412,358 pc€315,941€25.57481 stale
FY202511,646 pc€296,811€25.49471 stale
FY202612,570 pc€313,664€24.9548

Avg paid is per pc. Standard price in the material master: €25.40; planned lead time 35 days.