Impeller HN 200
part:310030castings· EN-GJS-400-15· 6.5 kg· pump series HN· ABC B· prices per pc· demand and sourcing →
What the data says
- 65 % of its cost follows market indices; over the last 12 months they moved its cost by +2.0 %.
- Index falls our agent can cite: electric power generation, transmission and distribution −6.1 % (2025-11 → 2026-08).
- Today's price €34.26 is below its full cost (margin -5 %) €35.98
cost:310030: the supplier loses money on this part. Squeezing it further adds risk, and for strategic and bottleneck parts the score charges for a supplier left below a sustainable margin. - Past rounds note:
accepted below full cost to keep the volume
(EV-2023-70120-310030).
Price against cost
Full cost is cost without margin. Our agent uses the should-cost of the supplier's own plant when there is one, else the German estimate scaled by the supplier's country (company rule of thumb).
| Estimate | Plant | Full cost | Material | Conversion | Overhead | Error | Method |
|---|---|---|---|---|---|---|---|
cost:3100302026-07-15 | Eisengießerei Velkenreith GmbH | €35.98 | €11.87 | €16.87 | €7.23 | ±5 % | bottom-up estimate of this supplier's plant, no margin included |
Price history
Every price condition since 2023 and the negotiation that set it: what the supplier asked and what was settled.
| Valid | Supplier | Why | Price | Change | Asked → settled | Note |
|---|---|---|---|---|---|---|
| 2026-01-01 → open | Eisengießerei Velkenreith GmbH | Annual renewal | €34.26 | −1.4 % | +2.6 % → −1.4 % | accepted below full cost to keep the volume |
| 2026-01-01 → open | Odlewnia Kalwisz Sp. z o.o. | Annual renewal | €30.14 | 0.0 % | +2.8 % → 0.0 % | |
| 2025-01-01 → 2025-12-31 | Eisengießerei Velkenreith GmbH | Annual renewal | €34.73 | −0.1 % | +1.1 % → −0.1 % | accepted below full cost to keep the volume |
| 2025-01-01 → 2025-12-31 | Odlewnia Kalwisz Sp. z o.o. | Annual renewal | €30.14 | 0.0 % | +3.8 % → 0.0 % | |
| 2024-01-01 → 2024-12-31 | Eisengießerei Velkenreith GmbH | Annual renewal | €34.77 | −5.6 % | −4.1 % → −5.6 % | accepted below full cost to keep the volume |
| 2024-01-01 → 2024-12-31 | Odlewnia Kalwisz Sp. z o.o. | Annual renewal | €30.14 | −6.2 % | −4.7 % → −6.2 % | |
| 2023-01-01 → 2023-12-31 | Eisengießerei Velkenreith GmbH | New contract | €36.82 | — | — | accepted below full cost to keep the volume |
| 2023-01-01 → 2023-12-31 | Odlewnia Kalwisz Sp. z o.o. | New contract | €32.12 | — | — |
Cost drivers
Which market indices drive this part's cost and by how much (category team estimate). Contribution = weight × the index's 12-month change. The shaded window is the fall our agent would cite (≥ 0.5 % within 12 months to the latest month), else the last 12 months.
| Index | Share of cost | Last 36 months | 12-month change | Contribution | Our agent can cite |
|---|---|---|---|---|---|
Labour cost index DE, manufacturing, seasonally and calendar adjusted (quarterly, carried to its three months) LCI-C · latest 2026-06: 119.6 (index 2020=100) | 33 % | +2.7 % | +0.88 pt | no fall | |
Producer prices DE: basic iron and steel, ferro-alloys PPI-C241 · latest 2026-08: 105.9 (index 2021=100) | 23 % | +6.5 % | +1.50 pt | no fall | |
Producer prices DE: electric power generation, transmission and distribution PPI-D351 · latest 2026-08: 131.9 (index 2021=100) | 9 % | −3.7 % | -0.33 pt | ||
| Index-linked share | 65 % (the rest does not follow an index) | Weighted | +2.05 % |
What we bought
Purchase order lines by order date, fiscal year October to September.
| Year | Quantity | Spend | Avg paid | PO lines |
|---|---|---|---|---|
| FY2024 | 7,162 pc | €243,564 | €34.01 | 471 stale |
| FY2025 | 7,690 pc | €256,247 | €33.32 | 492 stale |
| FY2026 | 7,556 pc | €250,074 | €33.10 | 48 |
Avg paid is per pc. Standard price in the material master: €32.44; planned lead time 49 days.
Letters about this part
Supplier letters, e-mails and our memos that name this part. Each opens in its supplier's timeline.
No letters name this part.