All parts

Volute casing HN 50-200

part:310010castings· EN-GJL-250· 38 kg· pump series HN· ABC A· prices per pc· demand and sourcing →

Negotiated in:P01replay · 91
Price today
€126.53
Gießerei Brandlhuber GmbH & Co. KG
Full cost
€132.64
what our agent assumes
Margin
−4.8 %
(price − full cost) ÷ price
Drivers, 12 months
+2.3 %
64 % of cost index-linked
Asked
+9.5 %
letter of 2026-09-11
Bought FY2026
€954,629
7,520 pc

What the data says

  • Gießerei Brandlhuber GmbH & Co. KG asks +9.5 % (to €138.55) from 2026-11-01 doc:20260911-70110-P01.
  • 64 % of its cost follows market indices; over the last 12 months they moved its cost by +2.3 %. That leaves 7.2 points of the ask that the market does not explain.
  • Index falls our agent can cite: electric power generation, transmission and distribution −6.1 % (2025-11 → 2026-08).
  • Today's price €126.53 is below its full cost (margin -4.8 %) €132.64 cost:310010: the supplier loses money on this part. Squeezing it further adds risk, and for strategic and bottleneck parts the score charges for a supplier left below a sustainable margin.
  • Past rounds note: accepted below full cost to keep the volume (EV-2023-70110-310010).

Price against cost

Full cost is cost without margin. Our agent uses the should-cost of the supplier's own plant when there is one, else the German estimate scaled by the supplier's country (company rule of thumb).

MaterialConversionOverheadMargin (price above full cost)Current price
Gießerei Brandlhuber GmbH & Co. KGsup:70110DE · active · quota 100 % · tooling: Hollerau
Price €126.53 since 2026-01-01 (Annual renewal)
Full cost €132.64 (should-cost of its own plant)
Should-cost argument no
€43.77 + €62.21 + €26.66 = €132.64price €126.53 · €6.11 below full cost
Odlewnia Kalwisz Sp. z o.o.sup:70140PL · qualified · quota 0 % · tooling: supplier
Price not buying
Full cost no estimate
Should-cost argument —
EstimatePlantFull costMaterialConversionOverheadErrorMethod
cost:310010
2026-07-15
Gießerei Brandlhuber GmbH & Co. KG€132.64€43.77€62.21€26.66±5 %bottom-up estimate of this supplier's plant, no margin included

Price history

Every price condition since 2023 and the negotiation that set it: what the supplier asked and what was settled.

Gießerei Brandlhuber GmbH & Co. KGFull cost (Gießerei Brandlhuber)Asked from 2026-11-01
€126.68€130.59€134.49€138.402023202420252026full cost €132.64asked €138.55€126.53
ValidSupplierWhyPriceChangeAsked → settledNote
2026-01-01 → openGießerei Brandlhuber GmbH & Co. KGAnnual renewal€126.53−1.4 %+2.1 % → −1.4 %accepted below full cost to keep the volume
2025-01-01 → 2025-12-31Gießerei Brandlhuber GmbH & Co. KGAnnual renewal€128.27−0.1 %+1.9 % → −0.1 %accepted below full cost to keep the volume
2024-01-01 → 2024-12-31Gießerei Brandlhuber GmbH & Co. KGAnnual renewal€128.42−5.6 %−2.2 % → −5.6 %accepted below full cost to keep the volume
2023-01-01 → 2023-12-31Gießerei Brandlhuber GmbH & Co. KGNew contract€136.00——accepted below full cost to keep the volume

Cost drivers

Which market indices drive this part's cost and by how much (category team estimate). Contribution = weight × the index's 12-month change. The shaded window is the fall our agent would cite (≥ 0.5 % within 12 months to the latest month), else the last 12 months.

IndexShare of costLast 36 months12-month changeContributionOur agent can cite
Labour cost index DE, manufacturing, seasonally and calendar adjusted (quarterly, carried to its three months)
LCI-C · latest 2026-06: 119.6 (index 2020=100)
32 %
+2.7 %+0.85 ptno fall
Producer prices DE: basic iron and steel, ferro-alloys
PPI-C241 · latest 2026-08: 105.9 (index 2021=100)
26 %
+6.5 %+1.70 ptno fall
Producer prices DE: electric power generation, transmission and distribution
PPI-D351 · latest 2026-08: 131.9 (index 2021=100)
6 %
−3.7 %-0.22 pt
Index-linked share64 % (the rest does not follow an index)Weighted+2.33 %

What we bought

Purchase order lines by order date, fiscal year October to September.

YearQuantitySpendAvg paidPO lines
FY20247,220 pc€939,245€130.0924
FY20257,140 pc€916,088€128.3024
FY20267,520 pc€954,629€126.95241 stale

Avg paid is per pc. Standard price in the material master: €128.27; planned lead time 42 days.

Letters about this part

Supplier letters, e-mails and our memos that name this part. Each opens in its supplier's timeline.

  • 2026-09-11letterdoc:20260911-70110-P01
    Price adjustment from 01 November 2026
    Gießerei Brandlhuber GmbH & Co. KG
    asks +9.5 %€138.55from 2026-11-0151 days' notice