part:310051castings· 1.4408· 7.2 kg· pump series HI· ABC C· prices per pc· demand and sourcing →

Price today
€118.73
Feinguss Allgäu-Reiter GmbH
Full cost
—
what our agent assumes
Margin
—
(price − full cost) ÷ price
Drivers, 12 months
+1.9 %
62 % of cost index-linked
Asked
—
no open price letter
Bought FY2026
€146,992
1,419 pc

What the data says

  • 62 % of its cost follows market indices; over the last 12 months they moved its cost by +1.9 %.
  • Index falls our agent can cite: Alloy surcharge 1.4404, Isartal Edelstahlwerk (fictional mill, derived) −5.5 % (2026-06 → 2026-09); electric power generation, transmission and distribution −6.1 % (2025-11 → 2026-08).
  • Past rounds note: accepted below full cost to keep the volume (EV-2023-70160-310051).

Price against cost

Full cost is cost without margin. Our agent uses the should-cost of the supplier's own plant when there is one, else the German estimate scaled by the supplier's country (company rule of thumb).

MaterialConversionOverheadMargin (price above full cost)Current price
Feinguss Allgäu-Reiter GmbHsup:70180DE · active · quota 60 % · tooling: Hollerau
Price €118.73 since 2026-01-01 (Annual renewal)
Full cost no estimate
Should-cost argument —
Meridune Precision Castings Co., Ltd.sup:70160CN · active · quota 40 % · tooling: supplier
Price €79.44 since 2026-01-01 (Annual renewal)
Full cost €84.97 (should-cost of its own plant)
Should-cost argument no
€27.19 + €40.44 + €17.33 = €84.96price €79.44 · €5.52 below full cost
EstimatePlantFull costMaterialConversionOverheadErrorMethod
cost:310051
2026-07-15
Meridune Precision Castings Co., Ltd.€84.97€27.19€40.44€17.33±5 %bottom-up estimate of this supplier's plant, no margin included

Price history

Every price condition since 2023 and the negotiation that set it: what the supplier asked and what was settled.

Feinguss Allgäu-Reiter GmbHMeridune Precision Castings Co., Ltd.
€80.08€96.80€113.52€130.242023202420252026€118.73€79.44
ValidSupplierWhyPriceChangeAsked → settledNote
2026-01-01 → openMeridune Precision Castings Co., Ltd.Annual renewal€79.44−2.3 %−1.1 % → −2.3 %accepted below full cost to keep the volume
2026-01-01 → openFeinguss Allgäu-Reiter GmbHAnnual renewal€118.73−3.0 %+0.1 % → −3.0 %
2025-01-01 → 2025-12-31Meridune Precision Castings Co., Ltd.Annual renewal€81.34−0.3 %+1.0 % → −0.3 %accepted below full cost to keep the volume
2025-01-01 → 2025-12-31Feinguss Allgäu-Reiter GmbHAnnual renewal€122.450.0 %+4.0 % → 0.0 %
2024-01-01 → 2024-12-31Meridune Precision Castings Co., Ltd.Annual renewal€81.60−5.1 %−2.6 % → −5.1 %accepted below full cost to keep the volume
2024-01-01 → 2024-12-31Feinguss Allgäu-Reiter GmbHAnnual renewal€122.45−6.4 %−5.1 % → −6.4 %
2023-01-01 → 2023-12-31Meridune Precision Castings Co., Ltd.New contract€85.96——accepted below full cost to keep the volume
2023-01-01 → 2023-12-31Feinguss Allgäu-Reiter GmbHNew contract€130.88——

Cost drivers

Which market indices drive this part's cost and by how much (category team estimate). Contribution = weight × the index's 12-month change. The shaded window is the fall our agent would cite (≥ 0.5 % within 12 months to the latest month), else the last 12 months.

IndexShare of costLast 36 months12-month changeContributionOur agent can cite
Labour cost index DE, manufacturing, seasonally and calendar adjusted (quarterly, carried to its three months)
LCI-C · latest 2026-06: 119.6 (index 2020=100)
29 %
+2.7 %+0.77 ptno fall
Alloy surcharge 1.4404, Isartal Edelstahlwerk (fictional mill, derived)
AS-14404 · latest 2026-09: 3007.8019 (EUR/t)
24 %
+5.9 %+1.42 pt
Producer prices DE: electric power generation, transmission and distribution
PPI-D351 · latest 2026-08: 131.9 (index 2021=100)
9 %
−3.7 %-0.33 pt
Index-linked share62 % (the rest does not follow an index)Weighted+1.86 %

What we bought

Purchase order lines by order date, fiscal year October to September.

YearQuantitySpendAvg paidPO lines
FY20241,282 pc€138,532€108.0649
FY20251,373 pc€146,116€106.42474 stale
FY20261,419 pc€146,992€103.59491 stale

Avg paid is per pc. Standard price in the material master: €101.90; planned lead time 49 days.