All parts

Impeller HN 250

part:310031castings· EN-GJS-400-15· 9.8 kg· pump series HN· ABC B· prices per pc· demand and sourcing →

Price today
€54.42
Eisengießerei Velkenreith GmbH
Full cost
—
what our agent assumes
Margin
—
(price − full cost) ÷ price
Drivers, 12 months
+1.9 %
64 % of cost index-linked
Asked
—
no open price letter
Bought FY2026
€281,896
5,180 pc

What the data says

  • 64 % of its cost follows market indices; over the last 12 months they moved its cost by +1.9 %.
  • Index falls our agent can cite: electric power generation, transmission and distribution −6.1 % (2025-11 → 2026-08).

Price against cost

Full cost is cost without margin. Our agent uses the should-cost of the supplier's own plant when there is one, else the German estimate scaled by the supplier's country (company rule of thumb).

MaterialConversionOverheadMargin (price above full cost)Current price
Eisengießerei Velkenreith GmbHsup:70120DE · active · quota 100 % · tooling: Hollerau
Price €54.42 since 2026-01-01 (Annual renewal)
Full cost no estimate
Should-cost argument —

Price history

Every price condition since 2023 and the negotiation that set it: what the supplier asked and what was settled.

Eisengießerei Velkenreith GmbH
€54.45€55.16€55.88€56.592023202420252026€54.42
ValidSupplierWhyPriceChangeAsked → settledNote
2026-01-01 → openEisengießerei Velkenreith GmbHAnnual renewal€54.420.0 %+3.2 % → 0.0 %
2025-01-01 → 2025-12-31Eisengießerei Velkenreith GmbHAnnual renewal€54.420.0 %+2.0 % → 0.0 %
2024-01-01 → 2024-12-31Eisengießerei Velkenreith GmbHAnnual renewal€54.42−3.9 %−2.1 % → −3.9 %
2023-01-01 → 2023-12-31Eisengießerei Velkenreith GmbHNew contract€56.62——

Cost drivers

Which market indices drive this part's cost and by how much (category team estimate). Contribution = weight × the index's 12-month change. The shaded window is the fall our agent would cite (≥ 0.5 % within 12 months to the latest month), else the last 12 months.

IndexShare of costLast 36 months12-month changeContributionOur agent can cite
Labour cost index DE, manufacturing, seasonally and calendar adjusted (quarterly, carried to its three months)
LCI-C · latest 2026-06: 119.6 (index 2020=100)
30 %
+2.7 %+0.80 ptno fall
Producer prices DE: basic iron and steel, ferro-alloys
PPI-C241 · latest 2026-08: 105.9 (index 2021=100)
23 %
+6.5 %+1.50 ptno fall
Producer prices DE: electric power generation, transmission and distribution
PPI-D351 · latest 2026-08: 131.9 (index 2021=100)
11 %
−3.7 %-0.41 pt
Index-linked share64 % (the rest does not follow an index)Weighted+1.89 %

What we bought

Purchase order lines by order date, fiscal year October to September.

YearQuantitySpendAvg paidPO lines
FY20245,090 pc€280,056€55.02251 stale
FY20254,716 pc€256,645€54.4224
FY20265,180 pc€281,896€54.42241 stale

Avg paid is per pc. Standard price in the material master: €54.42; planned lead time 49 days.

Letters about this part

Supplier letters, e-mails and our memos that name this part. Each opens in its supplier's timeline.

No letters name this part.