All parts

Volute casing HN 100-315

part:310012castings· EN-GJL-250· 112 kg· pump series HN· ABC A· prices per pc· demand and sourcing →

Price today
€359.17
Gießerei Wimbacher GmbH
Full cost
€370.21
what our agent assumes
Margin
−3.1 %
(price − full cost) ÷ price
Drivers, 12 months
+2.2 %
68 % of cost index-linked
Asked
—
no open price letter
Bought FY2026
€663,874
1,795 pc

What the data says

  • 68 % of its cost follows market indices; over the last 12 months they moved its cost by +2.2 %.
  • Index falls our agent can cite: electric power generation, transmission and distribution −6.1 % (2025-11 → 2026-08).
  • Today's price €359.17 is below its full cost (margin -3.1 %) €370.21 cost:310012: the supplier loses money on this part. Squeezing it further adds risk, and for strategic and bottleneck parts the score charges for a supplier left below a sustainable margin.

Price against cost

Full cost is cost without margin. Our agent uses the should-cost of the supplier's own plant when there is one, else the German estimate scaled by the supplier's country (company rule of thumb).

MaterialConversionOverheadMargin (price above full cost)Current price
Gießerei Wimbacher GmbHsup:70130DE · active · quota 60 % · tooling: Hollerau
Price €359.17 since 2026-01-01 (Annual renewal)
Full cost €370.21 (should-cost of its own plant)
Should-cost argument no
€122.17 + €173.63 + €74.41 = €370.21price €359.17 · €11.04 below full cost
Gießerei Brandlhuber GmbH & Co. KGsup:70110DE · active · quota 40 % · tooling: Hollerau
Price €383.06 since 2026-01-01 (Annual renewal)
Full cost €347.27 (should-cost of its own plant)
Should-cost argument yes
€114.60 + €162.87 + €69.80 = €347.27price €383.06 · margin €35.79
EstimatePlantFull costMaterialConversionOverheadErrorMethod
cost:310012
2026-07-15
Gießerei Wimbacher GmbH€370.21€122.17€173.63€74.41±5 %bottom-up estimate of this supplier's plant, no margin included
cost:310012-70110
2026-07-15
Gießerei Brandlhuber GmbH & Co. KG€347.27€114.60€162.87€69.80±5 %bottom-up estimate of this supplier's plant, no margin included

Price history

Every price condition since 2023 and the negotiation that set it: what the supplier asked and what was settled.

Gießerei Wimbacher GmbHGießerei Brandlhuber GmbH & Co. KGFull cost (Gießerei Wimbacher)
€359.83€376.91€394.00€411.082023202420252026full cost €370.21€383.06€359.17
ValidSupplierWhyPriceChangeAsked → settledNote
2026-01-01 → openGießerei Brandlhuber GmbH & Co. KGAnnual renewal€383.06−1.4 %+1.5 % → −1.4 %
2026-01-01 → openGießerei Wimbacher GmbHAnnual renewal€359.17−1.4 %+0.9 % → −1.4 %
2025-01-01 → 2025-12-31Gießerei Brandlhuber GmbH & Co. KGAnnual renewal€388.31−0.1 %+2.6 % → −0.1 %
2025-01-01 → 2025-12-31Gießerei Wimbacher GmbHAnnual renewal€364.10−0.1 %+1.4 % → −0.1 %
2024-01-01 → 2024-12-31Gießerei Brandlhuber GmbH & Co. KGAnnual renewal€388.80−5.6 %−3.3 % → −5.6 %
2024-01-01 → 2024-12-31Gießerei Wimbacher GmbHAnnual renewal€364.55−5.6 %−3.2 % → −5.6 %
2023-01-01 → 2023-12-31Gießerei Brandlhuber GmbH & Co. KGNew contract€411.74——
2023-01-01 → 2023-12-31Gießerei Wimbacher GmbHNew contract€386.06——

Cost drivers

Which market indices drive this part's cost and by how much (category team estimate). Contribution = weight × the index's 12-month change. The shaded window is the fall our agent would cite (≥ 0.5 % within 12 months to the latest month), else the last 12 months.

IndexShare of costLast 36 months12-month changeContributionOur agent can cite
Labour cost index DE, manufacturing, seasonally and calendar adjusted (quarterly, carried to its three months)
LCI-C · latest 2026-06: 119.6 (index 2020=100)
31 %
+2.7 %+0.82 ptno fall
Producer prices DE: basic iron and steel, ferro-alloys
PPI-C241 · latest 2026-08: 105.9 (index 2021=100)
27 %
+6.5 %+1.77 ptno fall
Producer prices DE: electric power generation, transmission and distribution
PPI-D351 · latest 2026-08: 131.9 (index 2021=100)
10 %
−3.7 %-0.37 pt
Index-linked share68 % (the rest does not follow an index)Weighted+2.22 %

What we bought

Purchase order lines by order date, fiscal year October to September.

YearQuantitySpendAvg paidPO lines
FY20241,800 pc€683,488€379.72481 stale
FY20251,860 pc€696,094€374.24481 stale
FY20261,795 pc€663,874€369.8548

Avg paid is per pc. Standard price in the material master: €376.21; planned lead time 45 days.