All parts

Volute casing HN 65-250

part:310011castings· EN-GJL-250· 56 kg· pump series HN· ABC A· prices per pc· demand and sourcing →

Price today
€180.52
Gießerei Wimbacher GmbH
Full cost
€180.19
what our agent assumes
Margin
+0.2 %
(price − full cost) ÷ price
Drivers, 12 months
+2.1 %
66 % of cost index-linked
Asked
—
no open price letter
Bought FY2026
€895,762
4,940 pc

What the data says

  • 66 % of its cost follows market indices; over the last 12 months they moved its cost by +2.1 %.
  • Index falls our agent can cite: electric power generation, transmission and distribution −6.1 % (2025-11 → 2026-08).
  • Today's price €180.52 carries a 0.2 % margin over its full cost €180.19 cost:310011, too thin for our agent to argue should-cost (it needs the cost below 98 % of the price).
  • Past rounds note: accepted below full cost to keep the volume (EV-2023-70130-310011).

Price against cost

Full cost is cost without margin. Our agent uses the should-cost of the supplier's own plant when there is one, else the German estimate scaled by the supplier's country (company rule of thumb).

MaterialConversionOverheadMargin (price above full cost)Current price
Gießerei Wimbacher GmbHsup:70130DE · active · quota 100 % · tooling: Hollerau
Price €180.52 since 2026-01-01 (Annual renewal)
Full cost €180.19 (should-cost of its own plant)
Should-cost argument no
€59.46 + €84.51 + €36.22 = €180.19price €180.52 · margin €0.33
Gießerei Pfaffenreuth GmbHsup:70190DE · qualified · quota 0 % · tooling: Hollerau
Price not buying
Full cost no estimate
Should-cost argument —
EstimatePlantFull costMaterialConversionOverheadErrorMethod
cost:310011
2026-07-15
Gießerei Wimbacher GmbH€180.19€59.46€84.51€36.22±5 %bottom-up estimate of this supplier's plant, no margin included

Price history

Every price condition since 2023 and the negotiation that set it: what the supplier asked and what was settled.

Gießerei Wimbacher GmbHFull cost (Gießerei Wimbacher)
€180.36€184.86€189.36€193.862023202420252026full cost €180.19€180.52
ValidSupplierWhyPriceChangeAsked → settledNote
2026-01-01 → openGießerei Wimbacher GmbHAnnual renewal€180.52−1.4 %+0.9 % → −1.4 %accepted below full cost to keep the volume
2025-01-01 → 2025-12-31Gießerei Wimbacher GmbHAnnual renewal€183.00−0.1 %+1.3 % → −0.1 %accepted below full cost to keep the volume
2024-01-01 → 2024-12-31Gießerei Wimbacher GmbHAnnual renewal€183.22−5.6 %−2.9 % → −5.6 %accepted below full cost to keep the volume
2023-01-01 → 2023-12-31Gießerei Wimbacher GmbHNew contract€194.03——accepted below full cost to keep the volume

Cost drivers

Which market indices drive this part's cost and by how much (category team estimate). Contribution = weight × the index's 12-month change. The shaded window is the fall our agent would cite (≥ 0.5 % within 12 months to the latest month), else the last 12 months.

IndexShare of costLast 36 months12-month changeContributionOur agent can cite
Labour cost index DE, manufacturing, seasonally and calendar adjusted (quarterly, carried to its three months)
LCI-C · latest 2026-06: 119.6 (index 2020=100)
31 %
+2.7 %+0.82 ptno fall
Producer prices DE: basic iron and steel, ferro-alloys
PPI-C241 · latest 2026-08: 105.9 (index 2021=100)
25 %
+6.5 %+1.64 ptno fall
Producer prices DE: electric power generation, transmission and distribution
PPI-D351 · latest 2026-08: 131.9 (index 2021=100)
10 %
−3.7 %-0.37 pt
Index-linked share66 % (the rest does not follow an index)Weighted+2.09 %

What we bought

Purchase order lines by order date, fiscal year October to September.

YearQuantitySpendAvg paidPO lines
FY20245,200 pc€969,824€186.50251 stale
FY20254,980 pc€911,600€183.0524
FY20264,940 pc€895,762€181.33242 stale

Avg paid is per pc. Standard price in the material master: €183.00; planned lead time 45 days.

Letters about this part

Supplier letters, e-mails and our memos that name this part. Each opens in its supplier's timeline.

No letters name this part.